OEM · ODM · Private Label · Wholesale
Your women's sexy lingerie manufacturer in China.
Velora Intimatesis a vertically integrated women's sexy-lingerie factory in Shantou — OEM, ODM, private-label and wholesale supply of women's lingerie for brands, retailers, distributors and e-commerce sellers worldwide. From your tech pack or our 200+ in-house designs to packed, export-ready cartons.
800+ B2B clients · 40+ countries · BSCI & OEKO-TEX® certified

- MOQ (OEM)
- 100 pcs/style
- Sampling
- 3–5 days
- 500K
- Pieces / month capacity
- 12,000
- Factory floor (m²)
- 200+
- New styles / month
- 40+
- Export markets
- 98%
- On-time delivery
- BSCI
- Sedex
- ISO 9001
- OEKO-TEX
Product range
What we manufacture
Nine production-ready categories — cut, sewn and finished in-house, made to your tech pack or built from our design library.

Sexy Lingerie
Full-range sexy lingerie production — lace sets, chemises, garter sets and more, made to your tech pack or our 200+ in-house designs.

Babydolls & Chemises
Babydolls and chemises in lace, mesh and satin with adjustable straps and matching G-strings — bulk and private-label ready.

Bodystockings
Seamless and fishnet bodystockings knitted on dedicated machines — open-crotch, halter and full-body constructions.

Teddies & Bodysuits
Lace teddies, one-piece bodysuits and crotchless styles with snap closures, cut and sewn to spec.

Corsets & Bustiers
Steel-boned and lightly-boned corsets and bustiers with lacing, busk and hook-and-eye closures.

Lace Bra Sets
Matching bra-and-brief sets in re-embroidered and Chantilly-style lace with custom hardware and colorways.

Role-Play Costumes
Sexy role-play and cosplay costume sets — nurse, maid, uniform and holiday themes, multi-piece and accessory-ready.

Plus-Size Lingerie
A dedicated curve block (1X–6X) with true-to-size grading across every category — a fast-growing wholesale segment.

Leather & Latex
Faux-leather, wet-look and latex pieces with hardware detailing for fetish and statement ranges.
End-to-end manufacturing
OEM, ODM, private label & wholesale — under one roof
One vertically integrated factory covers every commercial model, so you brief a single partner from first sample to packed cartons.
OEM manufacturing
Send us your tech packs and we cut, sew and finish to spec — your designs, our 18 sewing lines, full QC and export documentation.
Learn moreODM design + manufacture
Pick from 200+ in-house designs and we restyle, recolor and re-brand them for you — a faster route to market with no pattern-making lead time.
Learn morePrivate label
Your woven labels, hangtags, polybags and gift boxes on every piece. We build your brand identity into production, not just the garment.
Learn moreCustom manufacturing
Bespoke constructions — special laces, hardware, sizing blocks and trims sourced and developed to match the look and fit you need.
Learn moreWholesale supply
Ready-to-ship stock styles and curated assortments in bulk, from 50 pcs, with consistent quality and reliable restock for fast-moving ranges.
Learn moreDropshipping
Blind-shipped, one-by-one fulfilment with your branding for Shopify, Amazon and TikTok sellers — no inventory to carry, no warehouse to run.
Learn moreHow it works
From tech pack to delivered cartons
A clear, repeatable production path — so you always know what happens next and when.
- 01
Inquiry & quote
Send your tech pack, reference or target price. You receive a costed quote with MOQ and lead time.
- 02
Sampling
We pattern, cut and sew a pre-production sample to your spec for approval.
- 03
Confirmation & materials
Sign-off on fit, fabric and trims; we book OEKO-TEX® materials and lock your PO.
- 04
Bulk production
Your order runs across 18 sewing lines with in-line operator checks at every station.
- 05
QC & inspection
AQL inspection, metal detection and your label, polybag and carton marks verified.
- 06
Shipping
Booked FOB, CIF or DDP by sea, air or express with full export documents.
Who we supply
Built for lingerie businesses
From a one-person e-commerce label to container-scale importers — we tailor MOQ, packaging and lead times to how you sell.
Lingerie & Apparel Brands
From first sample to scaled production for emerging and established labels.
ExploreAdult Stores & Chains
Fast-moving assortments, discreet packaging and reliable restock.
ExploreE-commerce Sellers
Amazon, Shopify and TikTok-ready supply with low MOQ and dropshipping.
ExploreBoutiques & Retailers
Curated wholesale ranges and small-batch private label.
ExploreDistributors & Importers
Container-scale supply, stable lead times and full export documentation.
ExploreWhy Velora
A manufacturing partner you can build on
17 years in the Shantou intimate-apparel cluster, vertically integrated from materials to packed cartons — so quality, compliance and timelines stay under one roof.
Low MOQ from 100 pcs
Start small per style and scale with confidence — lower MOQs are negotiable for trial and repeat orders.
Compliance built in
BSCI · Sedex · ISO 9001 · OEKO-TEX · REACH · CPSIA · AZO-free dyes · California Prop 65
Fast sampling (5–7 days)
In-house pattern and sample rooms turn approvals around quickly, so development never stalls your launch.
Reliable export
98% on-time delivery to 40+ countries, with full documentation.

FAQ
Common questions from buyers
Sourcing details on MOQ, samples, lead time, customization and shipping — answered up front.
What is your minimum order quantity (MOQ)?
Standard OEM MOQ is 100 pcs per style, and wholesale stock styles start at 50 pcs. Lower MOQ negotiable for trial/repeat orders and stock styles.
Can I order samples before placing a bulk order?
Yes. We make pre-production samples to your tech pack or from our in-house designs in 3–5 working days, with sample delivery in 5–7 days. Sample costs are typically credited against your bulk order.
What are your production lead times?
Bulk production runs 25–35 days after sample approval and deposit, depending on order size, fabric availability and finishing. We confirm an exact ship date on your PO.
Can you produce custom designs and add our logo and labels?
Absolutely. We support full OEM/ODM customization — your patterns, fabrics, colorways and hardware — plus private-label woven labels, hangtags, printed polybags and gift boxes so every piece ships under your brand.
Do you offer private label and dropshipping?
Yes. We private-label across every category and offer blind-shipped, one-by-one dropshipping for Shopify, Amazon and TikTok sellers, so you can launch your own brand without holding inventory.
What payment terms and shipping options do you accept?
We accept T/T (30% deposit, 70% before shipment), L/C at sight, Trade Assurance, PayPal (samples). We ship FOB, CIF, DDP, EXW by Sea freight, Air freight, Express (DHL/FedEx/UPS) from Shenzhen and Guangzhou, with full export documentation.
Get a quote for your next lingerie collection
We reply to every quote request within 12 business hours.